High Quality Galvanized Structural Steel H-beams Sizes 8mm - 64mm 100-408mm
Product Description
H-beam, do you always think that it becomes an I-beam when it is turned horizontally? In fact, these are two different steel components. The most intuitive difference between the two is that the inner side of one plate of the I-beam is inclined, while the H-beam is horizontal and vertical. The plate of the I-beam is shorter and can only withstand forces perpendicular to the plate, so it is often used to make beams. The plate of the H-beam is longer and can withstand forces in two directions, so it can be used to make columns. In addition, it is worth mentioning that the international name for I-beams is I-beams, because its cross-section looks like the capital letter I. Don't make the mistake next time you see it. I-beams and H-beams are two commonly used steels in construction projects. They have some differences in shape and use. This article will introduce the characteristics and application range of these two steels in detail so that readers can better understand their differences.
First of all, I-beams are a type of steel with an I-shaped cross-section. Its cross-sectional shape is similar to the "I" character, hence the name. The advantages of I-beams are that they have a small cross-sectional size, light weight, strong bearing capacity, and certain seismic resistance. Therefore, in construction projects, I-beams are often used to make light steel structures, such as light factories, warehouses, garages, etc.
Product Parameters
GB H beam | JIS H beam | ||||||
SIZE(mm) | KG/m | SIZE(mm) | KG/m | SIZE(mm) | KG/m | SIZE(mm) | KG/m |
100*100*6*8 | 17.2 | 390*300*10*16 | 107 | 100*100*6*8 | 16.9 | 388*402*15*15 | 140 |
125'125*6.5*9 | 23.8 | 396*199*7*11 | 56.7 | 125*125*6.5*9 | 23.6 | 390*300*10*16 | 105 |
150*75*5*7 | 14.3 | 400*150*8*13 | 55.8 | 150*75*5*7 | 14 | 396*199*7*11 | 56.1 |
148*100*6*9 | 21.4 | 400*200*8*13 | 66 | 148*100*6*9 | 20.7 | 400*200*8*13 | 65.4 |
150*150*7*10 | 31.9 | 400*400*13*21 | 172 | 150*150*7*10 | 31.1 | 400*150*8*13 | 55.2 |
175*90*5*8 | 18.2 | 400*408*21*21 | 197 | 175*90*5*8 | 18 | 400*400*13*21 | 172 |
175*175*7.5*11 | 40.4 | 414*405*18*28 | 233 | 175*175*7.5*11 | 40.4 | 400*408*21*21 | 197 |
194*150*6*9 | 31.2 | 428*407*20*35 | 284 | 194*150*6*9 | 29.9 | 414*405*18*28 | 232 |
198*99*4.5*7 | 18.5 | 440*300*11*18 | 124 | 198*99*4.5*7 | 17.8 | 428*407*20*35 | 283 |
200*100*5.5*8 | 21.7 | 446*199*8*12 | 65.5 | 200*100*5.5*8 | 20.9 | 440*300*11*18 | 121 |
200*200*8*12 | 50.5 | 450*200*9*14 | 76.5 | 200*200*8*12 | 49.9 | 446*199*8*12 | 65.1 |
200*204*12*12 | 56.7 | 482*300*11*15 | 115 | 200*204*12*12 | 56.2 | 450*200*9*14 | 74.9 |
244*175*7*11 | 44.1 | 488*300*11*18 | 129 | 244*175*7*11 | 43.6 | 482*300*11*15 | 111 |
248*124*5*8 | 25.8 | 496*199*9*14 | 79.5 | 248*124*5*8 | 25.1 | 488*300*11*18 | 125 |
250*125*6*9 | 29.7 | 500*200*10*16 | 89.6 | 250*125*6*9 | 29 | 496*199*9*14 | 77.9 |
250*250*9*14 | 72.4 | 506*201*11*19 | 103 | 250*250*9*14 | 71.8 | 500*200*10*16 | 88.2 |
250*255*14*14 | 82.2 | 582*300*12*17 | 137 | 250*255*14*14 | 81.6 | 506*201*11*19 | 102 |
294*200*8*12 | 57.3 | 588*300*12*20 | 151 | 294*200*8*12 | 55.8 | 582*300*12*17 | 133 |
294*302*12*12 | 85 | 594*302*14*23 | 175 | 294*302*12*12 | 83.4 | 588*300*12*20 | 147 |
298*149*5.5*8 | 32.6 | 596*199*10*15 | 95.1 | 298*149*5.5*8 | 32 | 594*302*14*23 | 170 |
298*201*9*14 | 65.4 | 600*200*11*17 | 106 | 300*150*6.5*9 | 36.7 | 596*199*10*15 | 92.5 |
300*150*6.5*9 | 37.3 | 606*201*12*20 | 120 | 300*300*10*15 | 93 | 600*200*11*17 | 103 |
300*300*10*15 | 94.5 | 692*300*13*20 | 166 | 300*305*15*15 | 105 | 606*201*12*20 | 118 |
300*305*15*15 | 106 | 700“300*13-24 | 185 | 340*250*9*14 | 78.1 | 692*300*13*20 | 163 |
340*250*9*14 | 79.7 | 792*300*14*22 | 191 | 346*174*6*9 | 41.2 | 700*300*13*24 | 182 |
346*174*6*9 | 41.8 | 800*300*14*26 | 210 | 350*175*7*11 | 49.4 | 800*300*14*26 | 207 |
350*175*7*11 | 50 | 900*300*16*28 | 243 | 350*350*12*19 | 135 | ||
350*350*12*19 | 137 | ||||||
Production Flow Chart

Project Case



Pack And Ship

Certificate






Customer Praise



Plant And Equipment




FAQ
Q1: What is your terms of payment?
A: 30% T/T in advance, the balance 70% before delivery. We will show you the photos of products and package before you pay the balance.
Q2: what is the terms of delivery?
A: EXW, FOB, CIF, CFR, DDU
Q3: What is the terms of packing?
A: generally, we pack our goods in bundles or coils with rods or belts, we could also pack the goods as the customers' requirement.
Q4: What is your delivery time?
A: For stocks, we could transport the goods to loading port within 7 days after we received your deposit. For production period, it usually takes about 15 days-30 days after receiving the deposit.
Q5: Could you provide the samples?
A: yes, we could provide the free samples on conditons it is available in stocks, however, the the transportation fee is borne by buyer.
Q6: How could you guarantee your products?
A: Each piece of products is manufactured by certified workshops, inspected by Lenser piece by piece according to national QA/QC standard. We also could issue the warranty to customer to guarantee the quality.